top of page

PROJECT 2

Case Study and Documentation of Building Services Systems 

30% of Final Mark 

 

 

In a group of 6, we went for a field trip in Heriott Watt Putrajaya Campus. Thorough  the study and analysis of the mechanical ventilation, air-conditioning system, fire protection system (active and passive fire protection system), and mechanical transportation system, we documented those researches into a report and summarize them into two A2 boards.

 

Through this project, a clearer picture of what we have learnt in the classroom had been given. Also, to evaluate our understanding on the systems that used in commercial building. Heriot Watt Putrajaya Campus provided us a platform to observe the advanced systems used to achieve a green building. 

 

 


  • w-facebook
  • Twitter Clean
  • w-flickr
bottom of page