top of page

PROJECT 1
Application of Building Services
40% of Final Mark
Overall, students required to apply appropriate building services system and solution in the previous studio works. Through that, students able to develop understanding and knowledge of building services systems in design and construction. Students are expected to demonstrate their understanding of building services by proposing and designing the most appropriate systems which included electrical supply system, cold water and hot water supply system, sewerage and sanitary system, and drainage system.


bottom of page